DelayOnline books by this author are available.
See also what's at your library, or elsewhere.
|
Filed under: Delay- Telemetry and physician/rescue personnel communication. Final report. (1971), by E. Nagel (page images at HathiTrust)
- Right-turn-on-red: current practices and state-of-the-art. Interim report. (1974), by Hugh W. McGee (page images at HathiTrust)
- Fuel consumption study. Urban traffic control system (UTCS) software support project. Final report. (1976) (page images at HathiTrust)
- Traffic signal warrants from gap detector data. Final report (1982), by Louis G. Neudorff (page images at HathiTrust)
- A model to calculate delay savings for highway improvement projects. Interim report. (1983), by J. L. Memmott and Jesse L. Buffington (page images at HathiTrust)
- Analysis of the sample interval and study period used to conduct delay studies at signalized intersections. Final report. (1985), by Roger L. Hatton (page images at HathiTrust)
- Optimizing detector placement for high speed isolated signalized intersections using vehicular delay as the criterion. (1994), by Donald L. Woods and L. M. Koniki (page images at HathiTrust)
- Development and evaluation of a detection-control system for rural intersections. (2001), by James A. Bonneson, D. R. Middleton, K. Zimmerman, Hassan A. Charara, and Montasir Abbas (page images at HathiTrust)
- Assessing public inconvenience in highway work zones: final report. (2002), by Andrew Griffith and M. Lynde (page images at HathiTrust)
Items below (if any) are from related and broader terms. |