DelayOnline books by this author are available.
See also what's at your library, or elsewhere.
|
Filed under: Delay Telemetry and physician/rescue personnel communication. Final report. (1971), by E. Nagel (page images at HathiTrust) Right-turn-on-red: current practices and state-of-the-art. Interim report. (1974), by Hugh W. McGee (page images at HathiTrust) Fuel consumption study. Urban traffic control system (UTCS) software support project. Final report. (1976) (page images at HathiTrust) Traffic signal warrants from gap detector data. Final report (1982), by Louis G. Neudorff (page images at HathiTrust) A model to calculate delay savings for highway improvement projects. Interim report. (1983), by J. L. Memmott and Jesse L. Buffington (page images at HathiTrust) Analysis of the sample interval and study period used to conduct delay studies at signalized intersections. Final report. (1985), by Roger L. Hatton (page images at HathiTrust) Optimizing detector placement for high speed isolated signalized intersections using vehicular delay as the criterion. (1994), by Donald L. Woods and L. M. Koniki (page images at HathiTrust) Development and evaluation of a detection-control system for rural intersections. (2001), by James A. Bonneson, D. R. Middleton, K. Zimmerman, Hassan A. Charara, and Montasir Abbas (page images at HathiTrust) Assessing public inconvenience in highway work zones: final report. (2002), by Andrew Griffith and M. Lynde (page images at HathiTrust)
Items below (if any) are from related and broader terms. |