InfrastructureSee also what's at your library, or elsewhere.
Narrower term: |
Filed under: Infrastructure- A motorist radio service. Final report. (1972), by J. J. Renner and A. D. Owen (page images at HathiTrust)
- Study and development of highway advisory information radio. Final report. (1974), by R. A. Anderson and R. G. Robertson (page images at HathiTrust)
- Auditory message studies for route diversion. Final report. (1975), by Frank P. Gatling (page images at HathiTrust)
- Speed advisory information for reduced visibility conditions. Interim report. (1975), by F. D. Lane and J. L. Pfau (page images at HathiTrust)
- Human factor review of traffic control and diversion projects. Final report. (1973), by B. G. Knapp, J. I. Peters, and Donald A. Gordon (page images at HathiTrust)
- Improving the highway system by upgrading and optimizing traffic control devices. Final report. (1977), by Harold Lunenfeld (page images at HathiTrust)
- Variable message signing for traffic surveillance and control - a state of the art report. Final report. (1977), by Warren F. Dorsey (page images at HathiTrust)
- Integrated motorist information system (IMIS) feasibility and design study. Phase I: feasibility study. Volume 1 - final report. (1977), by P. Zove, R. Gordon, J. Scott, C. Berger, W. Domjan, and F. Soccoli (page images at HathiTrust)
- Integrated motorist information system (IMIS) feasibility and design study. Phase I: feasibility study. Volume 2 - appendices. Final report. (1977), by P. Zove, R. Gordon, J. Scott, C. Berger, W. Domjan, and F. Soccoli (page images at HathiTrust)
- Integrated motorist information system (IMIS) feasibility and design study. Phase I: feasibility study. Volume 3 - executive summary. Final report. (1977), by P. Zove, R. Gordon, J. Scott, C. Berger, W. Domjan, and F. Soccoli (page images at HathiTrust)
- Regulatory signs for lane occupancy and parking. Final report. (1978), by Donald A. Gordon (page images at HathiTrust)
- Human factors requirements for real-time motorist information displays. Vol. 1 - design guide. Final report. (1978), by Conrad L. Dudek, R. Dale Huchingson, William R. Stockton, Rodger J. Koppa, Stephen H. Richards, and T. M. Mast (page images at HathiTrust)
- Integrated motorist information (IMIS) feasibility and design study. Phase II: generalized methodology for IMIS feasibility studies. Volume 2--validation and application of feasibility study handbook. Final report. (1978), by P. Zove and C. Berger (page images at HathiTrust)
- Highway advisory radio operational site survey and broadcast equipment guide. (1979), by Warren F. Dorsey (page images at HathiTrust)
- Human factors requirements for real-time motorist information displays. Volume 2: state-of-the-art: messages and displays in freeway corridors. Final report. (1978), by Conrad L. Dudek (page images at HathiTrust)
- Human factors requirements for real-time motorist information displays. Volume 3: summary of systems in the United States. Final report. (1978), by Conrad L. Dudek (page images at HathiTrust)
- Human factors requirements for real-time motorist information displays. Volume 4: bibliography and selected annotations: visual systems. Final report. (1978), by R. W. McNees and Stephen H. Richards (page images at HathiTrust)
- Human factors requirements for real-time motorist information displays. Volume 5: bibliography and selected annotations: audio systems. Final report. (1978), by John M. Mounce (page images at HathiTrust)
- Human factors requirements for real-time motorist information displays. Volume 6: questionnaire survey of motorist route selection criteria. Final report. (1978), by R. W. McNees and R. Dale Huchingson (page images at HathiTrust)
- Human factors requirements for real-time motorist information displays. Volume 7: analysis of driver requirements for intercity trips. Final report. (1978), by Conrad L. Dudek, R. Dale Huchingson, R. H. Ratcliff, and G. J. Mayer (page images at HathiTrust)
- Safety and environmental design considerations in the use of commercial electronic variable-message signage. Final report. (1980), by Jerry Wachtel and R. Netherton (page images at HathiTrust)
- Automatic audio signing - literature survey analysis. Interim report, phase 1, task A. (1981), by H. Nelson and H. Bluethenthal (page images at HathiTrust)
- Systems analysis and design guidelines for highway advisory radio. Executive summary. Final report. (1981), by H. C. Turnage (page images at HathiTrust)
- Systems analysis and design guidelines for highway advisory. Final report. (1981), by H. C. Turnage (page images at HathiTrust)
- Highway advisory radio user's guide. (1981), by H. C. Turnage (page images at HathiTrust)
- Feasibility of changeable message signs and highway advisory radio for freeway maintenance. Final report. (1981), by Conrad L. Dudek, Stephen H. Richards, and Michael J. S. Faulkner (page images at HathiTrust)
- Traffic control at the I-10 reconstruction work zone in Chambers County, Texas. Final report. (1981), by Michael J. S. Faulkner and Stephen H. Richards (page images at HathiTrust)
- Traffic management during urban freeway maintenance operations. Final report. (1982), by Conrad L. Dudek, Stephen H. Richards, and Michael J. S. Faulkner (page images at HathiTrust)
- A users' guide to positive guidance. Second edition. Final report. (1981), by Theodore J. Post, Gerson J. Alexander, and Harold Lunenfeld (page images at HathiTrust)
- Integrated motorist information system (IMIS). Phase III: development of detailed design and PS&E. Final report. (1982), by P. Zove, W. E. Johnson, J. F. DeMatte, and W. C. Gale (page images at HathiTrust)
- Traffic management during freeway reconstruction and in rural work zones. Final report. (1982), by Stephen H. Richards, Michael J. S. Faulkner, and Conrad L. Dudek (page images at HathiTrust)
- Human factors design of dynamic displays. Volume 1 - summary report. Final report (1982), by Conrad L. Dudek and R. Dale Huchingson (page images at HathiTrust)
- Controlling speeds in highway work zones. Interim report. (1984), by Stephen H. Richards, R. C. Wunderlich, and Conrad L. Dudek (page images at HathiTrust)
- Automatic audio signing. Volume I. Executive summary. Final phase III report. (1984), by H. C. Turnage and R. C. Hawthorne (page images at HathiTrust)
- Automatic audio signing. Volume II. Prototype development and prototype pilot demonstration program. Final phase III report. (1984), by H. C. Turnage, R. C. Hawthorne, and M. C. L. Birdseye (page images at HathiTrust)
- Traffic control systems handbook - 1985. Revised edition. Final report. (1985), by R. Wilshire, R. Black, R. Grochoske, and J. Higinbotham (page images at HathiTrust)
- Concepts for a low-cost motorist information system. Final report. (1985), by S. A. Smith and L. M. Miller (page images at HathiTrust)
- Handling traffic in work zones. Final report. (1985), by Conrad L. Dudek, Stephen H. Richards, and R. C. Wunderlich (page images at HathiTrust)
- Assessment of changeable message sign technology. Final report. (1986), by Richard C. Lavigne (page images at HathiTrust)
- Evaluation of the ADDCO flip-disc variable message sign. (1988), by S. Valdez (page images at HathiTrust)
- Evaluation of highway advisory radio in the I-35W traffic management network. Final report. (1979), by G. C. Carlson, R. D. Dahl, and A. Z. Lari (page images at HathiTrust)
- Human factors requirements for real-time motorist information displays. Volume 12: supplement to traffic state descriptors and route diversion and guidance studies. Final report. (1978), by R. Dale Huchingson, Rodger J. Koppa, M. L. Edwards, and Conrad L. Dudek (page images at HathiTrust)
- Human factors requirements for real-time motorist information displays. Volume 13: human factors evaluation of audio and mixed modal variables. Final report. (1978), by R. Dale Huchingson, Rodger J. Koppa, and Conrad L. Dudek (page images at HathiTrust)
- Human factors design of dynamic visual and auditory displays for metropolitan traffic management. Volume 2 - dynamic visual displays. Final report. (1981), by Conrad L. Dudek, R. Dale Huchingson, R. D. Williams, and Rodger J. Koppa (page images at HathiTrust)
- A users' guide to positive guidance. 3rd edition. Final report. (1990), by Harold Lunenfeld and Gerson J. Alexander (page images at HathiTrust)
- An evaluation of the Detroit freeway operations (SCANDI) project. Final report. (1988), by Lidia P. Kostyniuk, T. L. Maleck, William C. Taylor, and Abdul-Rahman Ibrahim Hamad (page images at HathiTrust)
- Use of highway advisory radio in lieu of tourist information signs. (1990), by Jerome W. Hall (page images at HathiTrust)
- INFORM evaluation. Volume I: technical report. Draft final report. (1992), by S. A. Smith (page images at HathiTrust)
- INFORM evaluation. Volume II: executive summary. Draft final report. (1992), by S. A. Smith (page images at HathiTrust)
- Symposium on work zone traffic control. Proceedings. Final report. (1991), by Hugh W. McGee, L. F. McGee, N. L. Geisler, and 18-19 Jan 1991 Symposium on Work Zone Traffic Control--Making It Work (page images at HathiTrust)
- Advanced technologies for communicating with motorists: a synthesis of human factors and traffic management issues. (1992), by Kevin N. Balke and Gerald L. Ullman (page images at HathiTrust)
- Development of fiberoptic sign displays for dynamic lane assignment. (1992), by Wayne L. Gisler and Neilon J. Rowan (page images at HathiTrust)
- Feasibility of an automatic truck warning system. Final report. (1993), by H. McGee, Sarath C. Joshua, Warren Edward Hughes, R. Strickland, Zevi Bareket, and P. Fancher (page images at HathiTrust)
- MIDAS: Motorist Information and Driver Automation Systems. Final report. (1991), by C. Hill and Neil Emmott (page images at HathiTrust)
- ITS Institutional and Legal Issues Program. Review of the TravelAid operational test. Final report. (1995), by M. Morrissey and Allan J. DeBlasio (page images at HathiTrust)
- Space management: an application of dynamic lane assignment. Interim report. (1993), by R. K. Jella, Srinivasa R. Sunkari, Wayne L. Gisler, Neilon J. Rowan, and Carroll J. Messer (page images at HathiTrust)
- Effectiveness of changeable message signs in controlling vehicle speeds in work zones. Final report. (1994), by Nicholas J. Garber and S. Patel (page images at HathiTrust)
- Changeable message sign visibility. Final report. (1996), by Philip M. Garvey and Douglas J. Mace (page images at HathiTrust)
- Uniform traffic control and warning messages for portable changeable message signs. Final report. (1995), by Richard L. Knoblauch, Marsha Nitzburg, R. Seifert, H. McGee, and K. Daily (page images at HathiTrust)
- Analysis of truck drivers' opinions on safety and traffic control on highway work zones. Volume I: summary of findings. Final report. (1995), by R. F. Benekohal, E. Shim, and P. T. V. Resende (page images at HathiTrust)
- Analysis of truck drivers' opinions on safety and traffic control on highway work zones. Volume II. Final report. (1995), by R. F. Benekohal, P. T. V. Resende, and E. Shim (page images at HathiTrust)
- Innovative traffic control technology and practice in Europe. (1999), by Samuel C. Tignor, L. L. Brown, J. L. Butner, Richard A. Cunard, Stacy C. Davis, H. Gene Hawkins, Edward L. Fischer, M. R. Kehrli, P. F. Rusch, and W. S. Wainwright (page images at HathiTrust)
- Evaluation of traffic control devices for rural high-speed maintenance work zones: second year activities and final recommendations. (2000), by Michael D. Fontaine, Paul J. Carlson, and H. Gene Hawkins (page images at HathiTrust)
- Metropolitan model deployment initiative: national evaluation strategy. (Washington, D.C. : Federal Highway Administration, 1998), by Vassilios Alexiadis, Harold Carter, Allan J. DeBlasio, Vaughan W. Inman, B. Perez, C. St-Onge, and Michel W. Van Aerde (page images at HathiTrust)
- Reducing fog-related crashes on the Afton and Fancy Gap Mountain sections of I-64 and I-77 in Virginia. (2002), by C. Lynn, C. Schreiner, and R. Campbell (page images at HathiTrust)
- Improved dynamic message sign messages and operations. (2000), by Conrad L. Dudek, Nada D. Trout, Scott Booth, and Gerald L. Ullman (page images at HathiTrust)
- Arizona road weather information systems (RWIS) communications plan. (2003), by B. McQuiddy (page images at HathiTrust)
- [Intelligent transportation system technologies and mature drivers] (2004), by Mary Kihl, Sweta Bansal, Jennifer Brungart, Aaron Gannon, Thara Johnson, and Debarati Majumdar (page images at HathiTrust)
- Environmental design considerations for rural development projects (United States Agency for International Development, 1980), by United States. Agency for International Development and Harza Engineering Company (page images at HathiTrust)
More items available under narrower terms. |