Subject code: DDSNSee also what's at your library, or elsewhere.
|
Filed under: Subject code: DDSN- Navy weld defect tolerance study. (1981), by L. W. Sandor (page images at HathiTrust; US access only)
- Weld defect tolerance study. Final report. (1978), by L. W. Sandor (page images at HathiTrust; US access only)
- Construction planning and manpower schedules for the single-screw, multi-purpose mobilization ship, PD214 in cooperation with Avondale Shipyards, New Orleans, La. Final report. (1985), by Howard M. Bunch (page images at HathiTrust; US access only)
- The navy can improve material management at naval shipyards. (1985) (page images at HathiTrust)
- Shipboard Data Multiplex System (SDMS). (1982) (page images at HathiTrust; US access only)
- DDGX program producibility studies: study no. 3 - feasibility of DD 963 heritage ship. (1982) (page images at HathiTrust; US access only)
- DDGX program producibility studies: study no. 1 - cost reduction and product improvement. (1982) (page images at HathiTrust; US access only)
- DDGX program producibility studies: study no. 7B - NATVTRUSS structure phase I. (1982) (page images at HathiTrust; US access only)
- DDGX program producibility studies: study no. 7 - executive summary. (1982) (page images at HathiTrust; US access only)
- DDGX program producibility studies: study no. 7A - electronics complex producibility issues. (1982) (page images at HathiTrust; US access only)
- DDGX program producibility studies: study no. 7 - NAVTRUSS structure phase I. (1982), by H. L. Cheyne (page images at HathiTrust; US access only)
- DDG-51 corrosion control. (1982), by D. Bergey (page images at HathiTrust; US access only)
- Use of fiberglass reinforced piping and fittings. (1982) (page images at HathiTrust; US access only)
- DDG 51 design review and task 1-6 review. (1982) (page images at HathiTrust; US access only)
- DDGX guided missile destroyer concept design - DDGX producibility study no. 4: shipboard data multiplex system (SDMS). (1981) (page images at HathiTrust; US access only)
- DDGX program producibility studies: study no. 6 - contract data design package evaluation (1982) (page images at HathiTrust; US access only)
- Technical proposal for conduct producibility studies DDG-X. (1981) (page images at HathiTrust; US access only)
- Machinery study - hydraulic and lubricating fluids. (1981) (page images at HathiTrust; US access only)
- Foreign commercial shipyard repairs to U.S. government ships (The Office ;, 1987), by United States General Accounting Office (page images at HathiTrust)
- A shipyard critical skilled labor model for determining shortages during mobilization. (1988), by A. W. Katz (page images at HathiTrust; US access only)
- Status of SSN-21 ship construction program (The Office, 1990), by United States General Accounting Office (page images at HathiTrust; US access only)
- Navy maintenance: cost growth and schedule overrun problems continue at the shipyards. (1990) (page images at HathiTrust)
- Navy contract: AOE 6 shipbuilding claims settled but more delays and cost growth likely. (1993) (page images at HathiTrust)
- Navy ships: Seawolf cost increases and schedule delays continue. (1994) (page images at HathiTrust)
- U.S. Navy/Military Sealift Command: weak contract administration led to unsafe and poorly maintained ships. (1994) (page images at HathiTrust)
Items below (if any) are from related and broader terms. |